The building of a tennis court begins with the excavation required to clear the ground of elements such as trees and rocks that might present an obstacle. The next step, backfilling, is the first step in evening out the ground.,The next step is levelling, a procedure performed with a laser system that ensures perfect accuracy. Using this system, a slight slope is created to allow optimal water runoff. Soil compaction guarantees the stability of the installation.

Lighting poles and fencing are installed at this stage. At the client's request, fence posts can be placed at a 45° angle to the ground: balls will then automatically return behind the players. The angles are normally 90°.

The final step is the application of the different layers of surface. This process is very delicate and must be performed with great precision.

 

EXCAVATION

BACKFILLING

PRECISION LEVELLING

COMPACTION

INSTALLATION OF LIGHTING POLES AND FENCE POSTS
INSTALLATION OF SPRINKLER SYSTEM (OPTIONAL)

SURFACE APPLICATION

 